NE 4th Street Ramps

Bellevue, WA

N.E. 4th Street BL & CL Offramps

The on & off ramps for this transit access project were value-engineered to utilize precast concrete elements for the superstructure and columns instead of the original cast-in-place design. The redesigned bridge allowed this critical regional transportation project to not only finish ahead of schedule, but under budget.

NE 4th Street Pic #2

These ramps include a complex combination of horizontal and vertical curves, as well as a super transition and over 32,900 lineal feet of precast prestressed flat panel girders, covering over 860 feet of roadway.


PCI Design Award Winner

PCI Design Award Winning Project